Summer Update: Testing Facility!

“We have dirt! It’s been a hectic week, but the regolith is in, and now only the last wall will need to be finished (that is a small job, but I don’t know when it will be completed).  I will keep you all posted as to the final completion of the facility.
Delivery today was smooth. Thanks to Baker Rock, Jeff Rook, Andre, Bret and Brian from PPlant, Allen, Justin, and my roommate, Loren. Most of the material was loaded using a Bobcat and spread using rakes and shovels. The rest was shoveled into the Bobcat bucket by hand. Everything was completed with Rook’s advice and, thankfully, without much airborne dust at all. It is now covered until the last wall can be installed.”

-Mike Hector

Leave a Reply