• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

UPbeat

News for and about University of Portland faculty and staff.

  • Home
  • Academics
  • Athletics
  • Campus Services
  • Events
  • Human Resources
  • University Relations

Construction projects

Main Entrance Updates

July 21, 2014

hWork is progressing on the University’s main Willamette Boulevard entrance and exit. Over the past weeks much of the new drainage system has gone into the ground on the Shipstad side of the drive. In addition, a bioswale has been excavated and its connections to the main drive have been completed. Over the next three weeks UP community members will start to see much more visible changes to the drive as workers start their concrete work and installation of sidewalks on the Shipstad side.

Beginning July 28 the traffic lane will move from the soccer field side to the Shipstad side, to allow installation and connection of catch basins and concrete pours for curbs and sidewalks.

Artist’s renderings and a work schedule are available at http://tinyurl.com/mygex3z. For more information contact Jim Ravelli, university operations, at 7540 or ravelli@up.edu.

Filed Under: 07-21-2014, Career Services, Facilities & Planning, University Operations, University Relations Tagged With: Construction projects, Jim Ravelli, Willamette Boulevard

Summer Construction Projects

May 5, 2014

hThe end of the school year marks the start of summer construction and repair efforts on campus, which will include:

  • Beauchamp Recreation and Wellness Center construction begins May 9, ends in July 2015. Fencing will be set up around the perimeter of the public safety block and the parking lot across from the Chiles center will be closed. Parking will be available in the main parking lot. Public Safety has relocated across the street to Haggerty 101. The TriMet bus stop (line #35) located on the corner of Portsmouth and Strong will be relocated across Willamette to the corner of Portsmouth and Willamette.
  • Tyson garage remodeling: starts in May, ends in September. Garage will be closed and remodeled into office space over the summer. The intent is for IT organization to move into this new space during fall semester.
  • Shipstad Hall: May-August. This summer the University will be replacing windows in Shipstad Hall with new double-pane windows.
  • Main entrance drive remodeling, May-August. The entrance will be repaved, the center median re-planted, and raised crosswalks will be added near Shipstad and the main parking lot turn to increase visibility and safety. One side of the driveway will be cloased at a time, and traffic will be limited to in-bound only. Exiting traffic will be asked to leave via the Portsmouth exit or the Kenna Hall exit.

Additional updates will be provided as projects are added. For more information contact university operations at landtiser@up.edu.

Filed Under: 05-05-2014, Campus Services Tagged With: Beauchamp Recreation Center, Construction projects, Shipstad Hall, Tyson garage, University Operations

Primary Sidebar

  • Email
  • Facebook
  • Instagram
  • RSS
  • YouTube

News Categories

UpDate

Katie Danielson, education, had her piece, “Effectiveness of scaling up a vocabulary intervention for low-income children, pre-K through first grade” (with coauthors Susan B. Neuman and Preeti Samudra) published in The Elementary School Journal, 121(3), 385-409. https://doi.org/10.1086/712492

Claire McKinley-Yoder, nursing, contributed “Student-led fall prevention care management reduced fall risks at assisted living facilities” (with coauthors Kiyoshi-Teo, H., Lemon, E., & Ochoa, O.) in the December 2020 edition of Innovation in Aging,  4(Suppl 1), 238, https://doi.org/10.1093/geroni/igaa057.767

September Nelson, nursing, was awarded Outstanding Abstract at the Western Institute of Nursing – Gerontology Special Interest Group, April 2021. She also attended the Western Institute of Nursing Research Conference- Predictors of intent of leave among long-term care nurses, April 2021.

Cara Hersh, English, was mentioned in a piece on crafting and presenting effective syllabi in The Chronicle of Higher Education’s Teaching newsletter.

 

Update Archive

About

UPbeat is a newsletter for University of Portland faculty and staff published through the marketing & communications office; submit information to Marc Covert, upbeat editor, at 8132 or upbeat@up.edu. Submission deadline is noon the Thursday prior to publication. Submissions may be edited for clarity, consistency, brevity, or style.

Copyright © 2021 · University of Portland